    • Adam, C.; Andre, P.; Aparecida Silva, C.; Hannay, J.; Lebrun, J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)
      The parallel use of whole building simulation and monitoring of building energy consumptions (heating, cooling, lighting and other electricity consumptions) represents a potential “high-level” commissioning tool in order ...
    • Andre, P.; Lacote, P.; Aparecida Silva, C.; Hannay, J.; Lebrun, J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)
      In the context of the IEA40 research project, a specification of a “Functional Test Procedure” was progressively developed using the CA-MET building in Namur as real size test bench for the application and validation of ...
    • Georges, B.; Lebrun, J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)
      The chilling plant of a large commercial building located in Brussels is currently submitted to repetitive commissioning. The measurements are automatically taken by the Building Energy Management System. This system has ...
    • Masy, G.; Lebrun, J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)
      The aim of the paper is to illustrate the possibilities offered by modelassisted commissioning in residential buildings. Three examples are considered: two small detached houses and a large multi-storey dwelling building. A ...
    • Andre, P.; Silva, C. A.; Fonseca, N.; Hannay, J.; Lebrun, J.; Lacote, P. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)
      Three years after its start up, the building considered here is not yet providing a satisfactory comfort to its occupants. Too cold and too hot environmental conditions were too often encountered in different occupied ...
    • Andre, P.; Cuevas, C.; Lacote, P.; Lebrun, J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)
      Commissioning is a unique opportunity, for all partners concerned, to learn a lot about the real behavior of a HVAC system. It has to start from comfort and health requirements in occupancy zones, and going back to the ...
    • Bertagnolio, S.; Lebrun, J.; Hannay, J.; Silva, C. A. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
      The case study presented here concerns the audit of a typical, medium-size, office building erected in Brussels at the end of the sixties. This building is equipped with a classical old fashioned air conditioning system ...